Steel room-in-room construction system with a guaranteed minimum insulation of 45 dB.
BoXy System is a patented construction system resulting from an acoustic design process that began in the 1990s; over 1,000 units have been installed across 12 countries. The guaranteed minimum sound insulation is 45 dB: the level required by ORF and Deutsche Welle, as well as by record labels such as Universal Music and Warner Music.
Modular rooms for broadcasting control rooms, post-production, and recording.
ORF, Vienna, has installed 37 BoXy rooms at the new Küniglberg media campus.
Universal Music Italy, Milan, received five studios—including a Dolby Atmos one—within 95 days from contract signing to completion.
The structural units incorporate BOXYGEN silenced ventilation, capable of providing up to 10 air changes per hour.
Each room can be dismantled and reassembled at a different location without compromising its measured isolation performance.
Speed of assembly
Guaranteed minimum insulation
Installed rooms
BOXYCAD library and in-house technical office supporting the project.
BoXy provides architectural firms with the BOXYCAD library, based on Autodesk AutoCAD, featuring dimensioned modules, doors, and glass walls for direct integration into the detailed design. The in-house technical department handles acoustic sizing, floor load calculations (including documentation for structural verification), and ductwork design. Finishes, colors, and glazing are determined in collaboration with the designer, while the system’s guaranteed insulation performance remains consistent regardless of the chosen configuration.
Demountable, reassemblable, expandable.
A BoXy room is a movable asset: if the premises change, it is dismantled, transported and reassembled without losing its insulation performance, and it can be extended with additional modules. Steel panels do not degrade: at end of life the room is dismantled and reused instead of being demolished like a drywall build.
They Chose BoXy
Tell us the available space, intended use and timeline: our technical office replies with a first assessment.
The form fields help us frame the project: floor area, application (broadcast, recording, education, office) and time horizon. With these details we prepare a feasibility assessment and an order of magnitude for the investment.
If you are looking for general information about the system, the FAQ and Technical Area answer the most common questions on performance, assembly and costs.