Live Broadcast – BOXY mobile control room
No problem. Only two conditions need to be fulfilled: an (at least halfway) levelled cement surface and an upper cover. The rest is up to BOXY.
All images are under copyright © Angelo Trani
Copyright ©2024 B-BEng s.r.l. All Rights Reserved. | B-BEng s.r.l. – VAT ID IT01486350554 – REA: TR 100759 – Cap. Soc. €10.000 i. v.
Designed and developed by CLOVERTHREE
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.